



Complete bathroom renovation in Amsterdam and the surrounding area
You choose in the showroom, we do the rest. A specialist for each trade, with one schedule and one point of contact.
- First a site visit at your home, only then a quote
- Work usually starts within 6 weeks of your approval
★★★★★“Het vakmanschap en de afwerking zijn echt van hoog niveau.”Bente, Google review (original in Dutch)
Book a free site visit
Within 24 hours we call you to make an appointment.
- Only used for your request
Prefer to call? 06 84 41 41 73
Short answer
What is included in a complete bathroom renovation in Amsterdam?
With a complete bathroom renovation in Amsterdam, MA Layan does everything, from demolition to the last bead of sealant: pipework, waterproofing, tiling, sanitaryware and fitting. You choose your bathroom in the showroom, each trade is done by its own specialist and you have one point of contact. We usually start about 6 weeks after signing. You get a 5-year guarantee on the tiling.
- Each trade has its own tradesman: the plumber lays the pipes, the tiler lays the tiles.
- You get an update with photos at every step, even when you are not at home.
- What a complete bathroom costs is explained in our guide to how the price is built up.
A specialist for each trade
The plumber does the pipework, the tiler the tiles, the electrician the spotlights. We schedule them one after the other, with one schedule and one point of contact.
- Eén planning voor alle vakmensen
- One point of contact, from site visit to handover
- Requested in the morning, called the same afternoon
You see every step, even when you are not there
Tijdens de verbouwing krijgt u foto-updates via WhatsApp. Zo ziet u hoe uw badkamer vordert, ook als u op uw werk bent. Wilt u het in het echt zien? Kom gerust kijken op uw bouwplaats.
- Foto-updates via WhatsApp
- Welkom op uw bouwplaats
Een inloopdouche, of een badkamer in een appartement?
A walk-in shower vraagt om een vloer op afschot, een waterdichte laag onder de tegels en een glazen wand die de spatten tegenhoudt. In een apartment hangt uw badkamer samen met de buren, de VvE en de afvoer in de vloer. Daar plannen we bij de opname al op.
- Vloer op afschot, zonder drempel
- Vooraf afgestemd met de VvE
- 5 jaar garantie op het tegelwerk
Projects
Bathrooms we have delivered
Real projects by our own tradespeople, no stock photos. Also a walk-in shower or a bathroom in an apartment.














We come by, take measurements and you get a quote per item.
How we work
Everything is included, and you know where you stand in advance
No separate parties for you to arrange yourself. We schedule each tradesman at the right moment.
Just a walk-in shower? Or a bathroom in an apartment with a VvE?
Always included with a complete bathroom
Demolition and removal
Old tiles, sanitaryware and pipes out, rubble taken away straight away.
Plumbing and drainage
New and concealed in the wall.
Electrics and lighting
Spotlights, mirror and sockets where you want them.
Waterproofing
Walls and floor, before a single tile goes down.
Wall and floor tiles
Laid neatly, even under a sloping roof.
Concealed cistern and taps
Built in and adjusted.
Collection and fitting
We collect your choice from the showroom.
Sealing and handover
Checked together, snag list on paper.
Certainty about price and work
Fixed price per item
No provisional sums. If the job does not change, the price does not change.
Extra work only after your approval
On paper and with the price included, before we carry it out.
Pay in instalments
You pay per completed phase, never everything in advance.
5-year guarantee
On tiling and watertightness, in writing at handover. The manufacturer's warranty applies to sanitaryware.
How your bathroom renovation goes
- 01Usually the same afternoon
We call you back
We go through your wishes and ask for a few photos of the room.
- 02After the first conversation
Site visit at your home
We take measurements, look at the pipes and drainage and think along with you.
- 03Shortly after the site visit
Quote per item
You see what each item costs and choose what you want done.
- 04At a time that suits you
You choose in the showroom
Tiles, shower and sanitaryware at our regular supplier.
- 05Work usually starts within 6 weeks of your approval
Work and handover
The right tradesman at every step, with photo updates via WhatsApp.
Reviews
What clients say about us
Super goede ervaring met Layan Bouw en Renovatie! Ze hebben me ontzettend goed geholpen en het werk is netjes en professioneel uitgevoerd. Goede communicatie, betrouwbaar en duidelijke afspraken. Zeker een aanrader!
Super tevreden met dit bouwbedrijf! Alles ging eigenlijk gewoon goed en het contact was prettig. Ze denken goed mee, komen hun afspraken na en leveren netjes werk af. Ook als er iets aangepast moest worden, werd dat gewoon netjes opgelost. Wij zijn blij met het resultaat en zouden ze zeker weer inschakelen!
Wij zijn ontzettend tevreden over de renovatie en het prachtige eindresultaat! Vanaf het allereerste contact was de service professioneel, vriendelijk en betrouwbaar. Er werd goed naar onze wensen geluisterd en er werd actief meegedacht over de beste oplossingen. Het vakmanschap en de afwerking zijn echt van hoog niveau. Alles is tot in de kleinste details netjes uitgevoerd en er werd zeer zorgvuldig en schoon gewerkt. Ook de communicatie gedurende het hele traject was uitstekend. Het eindresultaat heeft onze verwachtingen overtroffen. Ons huis heeft een prachtige, luxe uitstraling gekregen en we genieten er iedere dag van. Een professioneel en betrouwbaar bedrijf dat kwaliteit, service en klanttevredenheid duidelijk vooropstelt.Wij raden hen dan ook absoluut aan! Heel erg bedankt voor het geweldige werk en het prachtige resultaat
Zeer tevreden over de renovatie van onze badkamer en keuken door MA LAYAN BOUW & Renovatie. Het werk is netjes en vakkundig uitgevoerd. Er werd goed meegedacht over de mogelijkheden en alles is mooi afgewerkt. Ook het personeel was vriendelijk, behulpzaam en professioneel. De communicatie verliep prettig en afspraken werden goed nagekomen. Wij zijn erg blij met het eindresultaat en kunnen MA LAYAN BOUW & Renovatie zeker aanbevelen!
Top bedrijf, mijn badkamer is door hún gerenoveerd. Kwamen hun afspraken na en dachten goed mee. Ik raad ze aan!
Frequently asked questions
Is your question not listed? See all frequently asked questions or call us on 06 84 41 41 73 or send us a WhatsApp.
“Kept their promises and thought along with us.”
Demolition and removal, new pipework and electrics, waterproofing, tiling, collecting and fitting the sanitaryware and sealing. After the site visit you get a quote per item.
Then we discuss it with you first. We only carry out extra work after your written approval, with the price included.
Yes. You choose in the showroom of our regular supplier. We collect it and fit it.
Yes, as part of a complete approach to the shower area. Read what a walk-in shower involves with us.
Usually not if the bathroom stays in the same place. If you touch the main stack pipe or the floor, then it does. How we approach an apartment.
Yes. We work room by room and tidy up at the end of every day.
All over Amsterdam and North Holland, and also in Almere and Utrecht. By town: Utrecht, Almere, Haarlem, Zaandam, Hoofddorp, Purmerend, Amstelveen, Alkmaar, Hilversum, Naarden, Hoorn, Heerhugowaard, Beverwijk, Aalsmeer, Huizen, Volendam, Den Helder, Schagen, Nieuw-Vennep, Wormerveer. Is your town not listed? See our full service area.
First we look, then we give a price
Site visit at your home, then a quote per item.