Home/Prices

What does your renovation cost? How the price is built up

Every home is different. That is why we come and look first, and then you get a fixed price per component. Choose your job and see what is included.

Bathroom with walk-in shower, wall-hung toilet and illuminated mirrors
MA Layan tradesman at work
A specialist for each tradeOne schedule, one point of contact

The short answer

What a complete bathroom costs depends on the size, the finish you choose and what we find behind the old tiles. That is why we come and look first. After that you get a fixed price per component, including demolition, plumbing, tiling, installation and VAT.

What the levels mean

  • ComfortClean and solid, tiles and sanitaryware from the showroom's standard collection.
  • PremiumLarger format tiles, concealed taps and a vanity unit made to fit the room.
  • LuxuryEverything made to measure, such as a freestanding bath, natural stone and lighting in the niche.

What is included, what is extra and what costs more in Amsterdam

Always included

Priced separately, named in advance

  • Asbestos removal
  • Wood rot or a poor floor
  • Moving the drain to another position
  • VvE costs

If we come across it, we discuss it with you first.

What raises the price in Amsterdam

  • Upstairs flat without a liftMaterials up and rubble down via the stairs
  • Timber joistsReinforcing the floor and extra waterproofing
  • Skip on the streetMunicipal permit required
  • Apartment with a VvESet working hours, screening off the lift and stairwell

The short answer

What a complete home renovation costs depends on the square metres, the new layout and the finish. After the site visit you get a fixed price per component, so you decide what happens now and what can wait.

What the levels mean

  • ComfortNew layout, smooth plastering and a solid floor throughout the house.
  • PremiumMore made-to-measure work, such as fitted cupboards and doors and a herringbone floor.
  • LuxuryEverything made to measure, down to the skirting boards, the door hardware and the lighting.

What is included, what is extra and what costs more in Amsterdam

Always included

Priced separately, named in advance

  • Bathroom and kitchen, per item in the quote
  • Asbestos removal
  • Wood rot or foundation repair
  • VvE costs

If we come across it, we discuss it with you first.

What raises the price in Amsterdam

  • Upstairs flat without a liftEverything via the stairs, more hours for demolition and delivery
  • Apartment with a VvESound insulation under the floor and set working hours
  • Old pipesLead pipes or old electrics have to come out completely
  • Parking and skipPermit or exemption from the municipality

The short answer

What an extension or roof extension costs depends on the space you add, the structure and the interior finish. After the site visit and the structural engineer's advice you get a fixed price per component.

What the levels mean

  • ComfortSolid extension or roof extension with standard window frames and a neatly finished interior.
  • PremiumLarger glazing, a roof light or dormer and more made-to-measure work inside.
  • LuxuryFully made to measure, with special window frames, a steel-framed glass wall or an open roof structure.

What is included, what is extra and what costs more in Amsterdam

Always included

Priced separately, named in advance

  • Fees for the environmental permit
  • Structural engineer and drawings
  • Piles on poor ground
  • Rerouting the sewer or pipes

If we come across it, we discuss it with you first.

What raises the price in Amsterdam

  • Protected townscapeStricter requirements for the façade and window frames
  • Soft groundOften requires a pile foundation
  • Garden only accessible through the houseMaterials through the home, more protection
  • Crane on the streetExemption and a plan for the neighbours

Looking for the cheapest option? Then another provider will suit you better

Only replacing tiles and sanitaryware while leaving the old pipes in place, or wall panels over the old tiles: we deliberately do not do that. In a complete renovation we also renew the pipes and drains, so you can rely on them for years. That is why we are rarely the cheapest, and that is a deliberate choice.

Want it done properly once, with a specialist per trade and one point of contact? Then you have come to the right place.

What does a bathroom cost? Questions about the price

The questions asked most often on Google, with our honest answer.

At 6 m², the finish mainly determines the price: the tiles, the sanitaryware and whether you want a walk-in shower or a bath. Demolition, plumbing, tiling and installation are always included. After the site visit you get a fixed price per component.

At 10 m², the finish matters more than the size. A freestanding bath, a walk-in shower with two shower heads or a made-to-measure cabinet push the price up.

Yes. We collect your choice from the showroom and install everything, down to the sealant. Installation is always included in the price.

A common guideline is after 15 to 25 years. Sooner if you have leaks, loose tiles, mould in the grout or old pipes. During the site visit we look at what is still in good shape.

Your price on paper

Book a site visit and get a fixed price per component

We visit you, take measurements and discuss your wishes. Then you receive the quote per component. We only do extra work after your approval.

Book a free site visit

Within 24 hours we call you to make an appointment.

After your approval we usually start within about 6 weeks

Prefer to call? 06 84 41 41 73