What does a roof extension or extension cost in Amsterdam?

Shell only or finished, and which Amsterdam-specific costs come on top.

The MA Layan teamUpdated on 8 November 2026, 2 min read
Roof extension on a terraced house in progress

The short answer

What a roof extension or extension in Amsterdam costs depends mainly on the size and how far we finish it: shell only or fully finished. On top of that there are costs you do not have with a bathroom: the structural engineer, drawings, the permit and often scaffolding. You get a fixed price after the site visit, per component.

What does a roof extension cost, shell or finished?

With a shell, the roof extension or extension is wind and watertight: structure, roof, façade and window frames. You finish the inside later yourself or have us do it. With fully finished, the space is ready to use: insulation, pipework, electrics, plastering, floor and painting.

ItemShellFully finished
Structure, roof and façadeYesYes
Window frames and glazingYesYes
InsulationFaçade and roofYes
Plumbing and electricsNoYes
Plastering, floor, paintingNoYes

Additional costs

  • Structural engineer for the calculation that goes with the permit.
  • Construction drawings of the current and the new situation.
  • Fees (leges) for the environmental permit (omgevingsvergunning). What these cost is listed on amsterdam.nl.
  • Scaffolding and sometimes an exemption for the pavement.
  • Foundation survey for older buildings, if the structural engineer asks for one.

Extension or roof extension?

A rear extension takes up garden space, a roof extension does not. A roof extension asks more of the structure and almost always needs a permit. Which one fits depends on your home and your garden. We look at that together during the site visit.

“With a roof extension, the money is in the structure. That's why we calculate first and only build after that.”
The MA Layan team

Frequently asked questions

Is your question not listed? See all frequently asked questions or call us on 06 84 41 41 73.

That depends on shell or fully finished, and on the foundation. You get a fixed price after the site visit, per component.

Per m² it depends mainly on shell only or finished. After the site visit you get a price per item.

A dormer is an extension in the sloping roof. A roof extension replaces (part of) the roof with an extra storey with straight walls.

First we look, then we give a price

Request a site visit. We come round, measure up and then give you a quote per item.

Prefer direct contact?
Mon to Fri 07:30 to 18:30

Book a free site visit

Within 24 hours we call you to make an appointment.

After your approval we usually start within about 6 weeks

Prefer to call? 06 84 41 41 73