House and apartment renovation in Amsterdam and the surrounding area

Bathroom, kitchen, floors, plastering and layout in one schedule, with one point of contact.

★★★★★“Het vakmanschap en de afwerking zijn echt van hoog niveau.”Bente, Google review (original in Dutch)

Book a free site visit

Within 24 hours we call you to make an appointment.

After your approval we usually start within about 6 weeks

Prefer to call? 06 84 41 41 73

Specialist for each tradeCarpenter, plumber, plasterer: each in their own trade
One point of contactOne point of contact, from site visit to handover
Quote per itemExtra work only after your approval

Short answer

What does a complete home renovation include?

With a complete home renovation in Amsterdam, MA Layan takes on your house or apartment in one schedule: bathroom, kitchen, floors, plastering and layout. Each trade is done by a dedicated specialist and you have one point of contact from site visit to handover. In an apartment we coordinate with the VvE. We usually start about 6 weeks after signing.

Projects

Home renovation in Amsterdam: homes we renovated

Real projects by our own crew, no stock photos. Choose what you want to see.

View all projects
Kitchen diner on the ground floor
HouseKitchen diner on the ground floorAmsterdam
Is your home next?

We come by, take measurements and you get a quote per item.

Reviews

What clients say about us

ZZaid ZOctober 2026, original in Dutch
Super goede ervaring met Layan Bouw en Renovatie! Ze hebben me ontzettend goed geholpen en het werk is netjes en professioneel uitgevoerd. Goede communicatie, betrouwbaar en duidelijke afspraken. Zeker een aanrader!
YY CSeptember 2026, original in Dutch
Super tevreden met dit bouwbedrijf! Alles ging eigenlijk gewoon goed en het contact was prettig. Ze denken goed mee, komen hun afspraken na en leveren netjes werk af. Ook als er iets aangepast moest worden, werd dat gewoon netjes opgelost. Wij zijn blij met het resultaat en zouden ze zeker weer inschakelen!
BBente BSeptember 2026, original in Dutch
Wij zijn ontzettend tevreden over de renovatie en het prachtige eindresultaat! Vanaf het allereerste contact was de service professioneel, vriendelijk en betrouwbaar. Er werd goed naar onze wensen geluisterd en er werd actief meegedacht over de beste oplossingen. Het vakmanschap en de afwerking zijn echt van hoog niveau. Alles is tot in de kleinste details netjes uitgevoerd en er werd zeer zorgvuldig en schoon gewerkt. Ook de communicatie gedurende het hele traject was uitstekend. Het eindresultaat heeft onze verwachtingen overtroffen. Ons huis heeft een prachtige, luxe uitstraling gekregen en we genieten er iedere dag van. Een professioneel en betrouwbaar bedrijf dat kwaliteit, service en klanttevredenheid duidelijk vooropstelt.Wij raden hen dan ook absoluut aan! Heel erg bedankt voor het geweldige werk en het prachtige resultaat
FF BSeptember 2026, original in Dutch
Zeer tevreden over de renovatie van onze badkamer en keuken door MA LAYAN BOUW & Renovatie. Het werk is netjes en vakkundig uitgevoerd. Er werd goed meegedacht over de mogelijkheden en alles is mooi afgewerkt. Ook het personeel was vriendelijk, behulpzaam en professioneel. De communicatie verliep prettig en afspraken werden goed nagekomen. Wij zijn erg blij met het eindresultaat en kunnen MA LAYAN BOUW & Renovatie zeker aanbevelen!
AAdilSeptember 2026, original in Dutch
Top bedrijf, mijn badkamer is door hún gerenoveerd. Kwamen hun afspraken na en dachten goed mee. Ik raad ze aan!

Everything a complete renovation needs

You choose what you have done. We split the quote per item.

Changing the layout

Walls removed or added, with the structural engineer where needed.

Plumbing and electrics

Renewed and concealed.

Bathroom and toilet

Complete, from demolition to the last bead of sealant.

Kitchen

Connected and installed.

Plastering

Smooth walls and ceilings.

Floors

Herringbone too, meeting the VvE's noise requirements.

Frames and doors

Fitting and finishing.

Painting and finishing

Mouldings, skirting boards and the final details.

Take a look at an apartment renovation

Real photos of our work in an Amsterdam apartment, from bare wall to finished.

Room during finishing work with repaired walls and new plasterboard
Phase 1Walls and pipes
Wall with filler next to a window, ready for plastering
Phase 2Plastering
Herringbone floor being laid
Phase 3Laying the floor
Bedroom with herringbone floor and roof light after the renovation
Phase 4Finished

An apartment? We handle the VvE side

In an apartment building the building's own rules apply. We agree things in advance with the VvE and the property manager, work within the building's hours and screen off shared spaces.

Renovating an apartment: kitchen during finishing
Plastering in an occupied home with the floor covered

Staying in your home? Then we work room by room

In an occupied home we tackle the work room by room. At the end of every day we tidy up, so you can simply be at home. Is the home still empty? Then we renovate before the move.

Bright bathroom with walk-in shower and black vanity unit

Just bought a house? Renovate before you move in

Estate agents and property managers regularly refer new owners to us. We plan back from your key handover date and renovate in one go, so you move into a finished home.

From first phone call to handover, in five steps

At every step you know what is happening and who is doing it.

01

Usually the same day

We call you back

He talks through your wishes and asks for a few photos of the room.

02

After the first conversation

Site visit at your home

We measure up, look at the pipes and structure and think along with you.

03

Shortly after the site visit

Quote per item

You see what each item costs and choose what you want done.

04

At a time that suits you

You choose the materials and finish

You choose floors, tiles and sanitaryware together with us, and for bathrooms also in the showroom of our regular supplier.

05

Work usually starts within 6 weeks of your approval

Work and handover

The right tradesman at every step. Extra work only after your written approval.

New interior door in a room during finishing work, walls with filled seams
Bathroom with freestanding bath, walk-in shower and basin on a vanity unit

Fixed price per item

No provisional sums. If the job does not change, the price does not change.

Extra work only after your approval

On paper and with the price included, before we carry it out.

Pay in instalments

You pay per completed phase, never everything in advance.

Written guarantee

On a bathroom, 5 years on tiling and watertightness. If anything comes up after handover, we sort it out quickly.

Frequently asked questions

Is your question not listed? See all frequently asked questions or call us on 06 84 41 41 73.

Then we discuss it with you first. We only carry out extra work after your approval on paper, with the price included. That way you always know where you stand.

Yes. The quote is split per item, so you choose what you do now and what later.

We coordinate with the VvE and the building manager on schedule, working hours and protection. As the owner, you apply for the permission.

Yes. In an occupied home we work room by room and tidy up at the end of every day.

First we look, then we give a price

Request a site visit. We come round, measure up and then give you a quote per item.

Prefer direct contact?
Mon to Fri 07:30 to 18:30

Book a free site visit

Within 24 hours we call you to make an appointment.

After your approval we usually start within about 6 weeks

Prefer to call? 06 84 41 41 73