The short answer
For work inside your own apartment you usually don't need consent from the VvE. That changes if you touch shared parts, such as the main stack pipes, a load-bearing wall or the façade, or if the rules say something about floors and noise. So before the quote, read your deed of division and the house rules, and let the building manager know about the remodelling.
What is yours, and what belongs to the VvE?
With an apartment you are the owner of an apartment right: the right to use your own part. Exactly what your part is, is set out in the deed of division. Roughly speaking, the inside is yours, and the structure, the façade, the roof and the shared pipes belong to all the owners together.
This means you can usually have a new bathroom or kitchen fitted in the same place yourself. As soon as the work touches shared parts, the VvE has a say.
| Work | Usually your own decision | Usually ask the VvE first |
|---|---|---|
| Bathroom in the same place | Yes | Only if you connect to or replace the main stack pipe |
| Moving the bathroom or toilet | Yes, this often affects the drain and the floor | |
| Hard floor, such as herringbone | Check the rules first | Noise requirements often apply |
| Replacing the kitchen | Yes | Only with a new drain or extraction through the façade |
| Removing a wall | Non-load-bearing wall: usually yes | Load-bearing wall: yes, with a structural engineer and permit |
This is a general guideline. Your own rules always take precedence.
Five things to check before the quote
- The deed of division and the rules. Request them from the building manager or the Land Registry (Kadaster). They set out what is yours and what you need consent for.
- Rules for floors and noise. Many VvEs set requirements for the impact noise of a hard floor. We then lay an underlay that meets them.
- Working hours. Some buildings have set hours during which drilling and demolition are allowed.
- Lift, stairwell and rubble. How do the materials get up and the rubble get down? For a skip on the street in Amsterdam you need a permit from the municipality.
- The neighbours. A note through the letterbox a week beforehand prevents a lot of irritation.
Renovating an apartment in Amsterdam: what is different
Many Amsterdam apartments are in old buildings with timber joists, and the deed of division is sometimes decades old. Two things therefore need extra attention:
- Noise with timber floors. A hard floor on timber joists quickly causes impact noise for the neighbours below. Check what requirement your rules set; we choose the underlay based on that.
- Old rules. If they say nothing about remodelling, the model rules from the time of the division often apply. Ask the building manager which version belongs to your deed.
Which documents you submit
- A short technical description of the work
- A drawing of the new layout, if you are moving something
- The schedule and working hours
- Who is doing the work, with contact details
Sample request to the board
To the board of VvE [naam],
I am the owner of [adres en appartementsrecht]. I would like to have my bathroom renovated by MA Layan Bouw & Renovatie, from [startdatum] to [einddatum].
The work: [korte omschrijving]. The bathroom stays in the same place [of: wordt verplaatst naar]. Connection to the main stack pipe: [ja of nee]. New floor: [type, met ondervloer die voldoet aan de geluidseis uit het reglement].
Working hours: [tijden]. Materials and rubble go via [lift of trap], which we will cover. Skip on the street: [ja, met vergunning van de gemeente, of nee].
Attached: a technical description and a drawing. I would appreciate your response before [datum].
Kind regards,
[naam en telefoonnummer]
Copy this text and fill in the points in brackets. We supply the technical description and the drawing.
What we arrange with the VvE and the building manager
We agree in advance with the VvE and the property manager on planning, working hours and screening off shared spaces. During the work we cover the lift and the stairwell and remove the rubble every day. As the owner, you apply for the consent yourself.
- Coordination on schedule and working hours
- Lift and stairwell covered
- Rubble removed every day, shared spaces kept clean
How long does consent take?
If the work has to go to the owners' meeting, it depends on when that is. Some VvEs let the board decide, which is quicker. So ask in good time, ideally as soon as you know what you want done. We can do the site visit earlier, so you can give the VvE a clear description straight away.
“In an apartment, a good renovation starts with the building manager. If they know what's coming, the rest goes much more smoothly.”